45/0,42 kV outdated substation substitution. Works strategy consisted on 3×800 kVA old transformers change by a sole 1 MVA transformer, plus a emergency generator and backup cabinet. New HV switchgear installation, as well. These equipment elements connected to an automatic starter and two (main and secondary) 331 kW & 160 kW pumps.
Client---ServicesPreliminary engineering, Detail and erection engineering, Project managementYearIn progress