These project’s goal consists on public and decorative lighting technology substitution for LED systems. Substituted lamps were sodium and mercury vapor and halogen ones.
Also, another scope for this projects is the updating of control and switchgear inside the main lighting cabinets under current norms.
Minimum saving power rating was about 30% and over (maximum has been 70%) thanks to point-to-point optimization and regulation technology.
Scope for this project was management of documentary to get FEDER funds and grants.
Cities where these projects were carried out are:
• Numancia de la Sagra (Toledo).
• Villaseca de la Sagra (Toledo).
• Villamayor de Santiago (Cuenca).
• Villanueva de Alcardete (Toledo).
• La Puebla de Almoradiel (Toledo).
• Quintanar de la Orden (Toledo).
• Miguel Esteban (Toledo).
• El Toboso (Toledo).
• Pedro Muñoz (Ciudad Real).
• Campo de Criptana (Ciudad Real).
• Herencia (Ciudad Real).
• Carrascosa de Haro (Cuenca).
• Monreal del Llano (Cuenca).
• Santa María del Campo Rus (Cuenca).
• Villaescusa de Haro (Cuenca).
• Villar de la Encina (Cuenca).
Client---ServicesConsultancy, Preliminary engineering, Detail and erection engineering, Project management, European funds transfer (FEDER)Year---